Anybody Really Cares?

Happenings in my neighbourhood @ Kota Kemuning, Shah Alam, Selangor.

2008/7/24

Approached By The Contractor Again.

@ 09:09 PM (26 days, 9 hours ago)

It is now more than a fortnight since the meeting was called by MBSA. As at the time of writing this post, the covered-up wall is not demolish yet. And, the affected party has yet to hear from MBSA on what is actually happening.

On Friday, the 18th instant, between 6.15pm to 6.35 pm the contractor responsible for this renovation, approached the affected party (this time, the lady of the house) as she came back from work, alighted from her car and was opening her main gate.

The contractor told her that they were almost completing the job and asked when can they be allowed to come in to plaster and paint the two walls.

The affected party responded by saying that if you want to plaster the wall you must demolish the covered up wall first. And added that it was dark and no longer airy. However, the contractor said that once you let us do, and painted it will be brighter. He also said that it was airy.

Since the response from the affected party was not a favourable one, he finally walked away. 

» Leave a comment


:mrgreen: :neutral: :twisted: :arrow: :shock: :smile: :???: :cool: :evil: :grin: :idea: :oops: :razz: :roll: :wink: :cry: :eek: :lol: :mad: :sad: :!: :?:

Preview:

You say:

To prevent spam, please type in the exact word you see in this image: CAPTCHA
To refresh the image, click here. Otherwise, contact us.

  • Your E-mail address is never displayed. If you enter it, it will only be visible to the blog author
  • The line and paragraph breaks automatically